Expertise
Engineering depth, commercial control.
Project management, NEC4 contracts, MEICA engineering, water and wastewater treatment, safety and compliance, and renewable energy — from feasibility to commissioning.
PRINCE2 · Agile · Waterfall
Project Management
Critical-path planning, risk and issue management, cost control and contract administration across the full lifecycle.
- MS Project
- Gantt
- RAID
NEC4 ECC
NEC Contracts
Early Warnings, Compensation Events, variations and commercial control.
- EWN
- CE
Mech · Elec · ICA
MEICA Engineering
GA, P&ID, FDS and control-philosophy review; PLC/SCADA integration.
- P&ID
- SCADA
AMP frameworks
Water & Wastewater
SAF, MBBR, aeration, dosing, filtration and pumping for Thames Water and Southern Water.
- WIMES
- AMP
CDM 2015 · ISO
Safety & Compliance
Principal Contractor duties, RAMS and ISO 9001 / 14001 / 45001.
- SMSTS
- IOSH
Clients · Regulators
Stakeholder Leadership
Principal point of contact for clients, consultants, subcontractors and senior leadership.
- Reporting
MSc Brunel
Renewable Energy
Solar, hydropower and sustainable water treatment.
- Solar
- Hydro
Design · Planning
Engineering Tools
AutoCAD, SolidWorks, CATIA, Revit, FEA/CFD, Excel VBA, Jira and Smartsheet.
- CAD
- CFD
Standards and frameworks I deliver to
NEC4 Engineering & Construction Contract
Contract administration under NEC4 ECC: early warnings, compensation events, programme acceptance and variations, keeping commercial position and relationships intact.
CDM 2015
Principal Contractor and designer duties on water and wastewater sites — construction phase plans, RAMS review and coordinated, safe delivery.
ISO 9001, 14001 and 45001
Quality, environmental and health & safety management systems, including implementing and auditing ISO frameworks.
WIMES and water-company standards
MEICA delivery to WIMES and Thames Water and Southern Water health, safety and engineering requirements on AMP framework schemes.
IATF 16949
Automotive quality management for a low-volume ultra-sports car interior programme, with DFMEA and controlled design maturity.
PRINCE2
Structured governance: business case, stage gates, risk and issue logs, and clear reporting to clients and senior leadership.
How I run a project
01
Define
Clarify requirements, scope, risks and the commercial position; turn client needs into a robust technical proposal.
02
Design
Lead mechanical, electrical, ICA and civil design reviews — GA drawings, P&IDs, FDS and calculations.
03
Deliver
Control programme, budget and quality; coordinate subcontractors and the supply chain safely on site.
04
Handover
Commission, document and hand over: O&M manuals, as-builts and lessons learned for the next scheme.