Projects
Selected projects, first design to handover.
Water and wastewater upgrades for Thames Water and Southern Water, hydropower dams and turbines, an ultra-sports car interior programme and international IT rollouts.
- Years delivering projects
- 10+
- Largest programme value
- £30M
- Major projects delivered
- 13+
- Sectors: water to automotive
- 6
Automotive · 2022 — 2024
Mercedes-AMG ONE Interiors
Mercedes-AMG · via TECNIQ
Interior components for the Mercedes-AMG ONE hypercar, taken from design maturity through to production.
- Role:
- Project Manager
- Design maturity & milestone control
- DFMEA and IATF 16949 compliance
- Prototype builds to production
- Supplier and change coordination
Automotive · 2022 — 2024
Gordon Murray T.33 Interiors
Gordon Murray Automotive · via TECNIQ
Consultancy, design and manufacture of the full interior for 300 ultra-sports cars in three variants.
- Role:
- Project Manager
- Value:
- ~£30M
- Design maturity & milestone control
- DFMEA and IATF 16949 compliance
- Prototype builds to production ramp-up
- BoM, change control and supplier coordination
Wastewater · 2025
Wastewater Process Upgrades
Southern Water · via ATAC Solutions
Design, build and installation of SAF, Lamella, MBBR and Chemix treatment systems under AMP frameworks.
- Role:
- Project Manager
- Value:
- ~£1.5M
- MEICA design review and approval
- PLC/SCADA integration to WIMES
- NEC contract and change management
- Commissioning and handover
Water · 2024
Pumping Station Refurbishments
Thames Water · via Xylem
Design, supply, installation and site supervision for PCPD and 10+ small sewage pumping stations.
- Role:
- Project Engineer
- Value:
- ~£200k
- Pump schedules and GA approval
- M&E subcontractor supervision
- Thames Water HSI compliance
Hydropower · 2012 — 2016
Karoon 4 & Chahchahe Dams
Douce Hydro · STAHL GmbH
Spillway radial-gate hydraulic power units, power station, irrigation and bottom-outlet systems.
- Role:
- Mechanical / Project Engineer
- Value:
- ~£5M
- Mechanical calculations and CFD
- Tender and design packages
- Installation and O&M documentation
Oil & Gas · 2014 — 2016
South Pars Phase 19 Platforms
Offshore gas field development
Installation of anti-explosion ATEX gantry cranes for offshore platforms.
- Role:
- Mechanical / Project Engineer
- ATEX equipment specification
- Supplier and RFQ management
- Site installation support
Energy · 2014 — 2016
Soleh-Dokal Hydropower Plant
Hydropower generation
Installation of Pelton turbines, 2.3 MW each.
- Role:
- Mechanical / Project Engineer
- Turbine installation planning
- Commissioning documentation
IT Infrastructure · 2019 — 2022
Global Retail & Automotive Rollouts
Snap-on · AVI-SPL · PRO AV · Kinly · via IT Vault
Renault digital rollout (100 sites), Toyota TechDoc (200 installs UK & EU) and 50+ Apple Store installations.
- Role:
- Project Manager
- Value:
- ~£1M
- Multi-region programme planning
- Site surveys and install crews
- ISO 9001 / 27001 governance